+2 votes
in Software Engineering by

1 Answer

+1 vote
by
selected by
 
Best answer
To measure reliability you need to have statistically valid failure data for the system so you need to induce more failures than are specified in the given time period. However, because the number of failures is so low, this will take an unrealistically large amount of time.

Related questions

Welcome to CPEN Talk
Solution-oriented students of computer engineering on one platform to get you that

ONE SOLUTION

Chuck Norris does not need to type-cast. The Chuck-Norris Compiler (CNC) sees through things. All way down. Always.
...